Language: Chinese line English

Customer Case

The main welding line has a total of 13 stations, and adopts the form of lifting roller + skid conveying; The bodyside assembly line adopts manual pre-assembly line, the front top beam and the back top beam use manual pre-assembly line, and the top cover assembly line adopts manual sling line. The engine assembly, front bottom plate assembly and rear bottom plate assembly are equipped with lifting gear.

LATEST NEWS

CONTACT US

Contact: Mr. Li

Phone: 18055337960

Tel: 0553-5612557

Email: lixinghai@anhui-at.com

Add: 69 Fuqiang Road, Jiujiang Economic Development Zone, Wuhu City, Anhui Province